Our Services

Polyurethane Concrete Lifting

Simple 3 step process

Caulking

New concrete

  1. Drill. We drill a small 5/8 hole.

  2. Pump. We inject our NCFI polyurethane foam powered by poly pier underneath the slab filling and raising the concrete slab.

  3. Patch. We fill the 5/8 holes back with concrete.

  • We fill and seal cracks and control joints with our silicone based caulking.

  • In certain cases concrete can be to cracked or settled to lift and if that’s the case we work with a concrete company that can replace the slab.